Comminution and concentration plants consume wear parts and reagents continuously, which makes mining supply a planning problem more than a purchasing one. We supply crushing and grinding spares, flotation reagents, screening media, material handling components and blasting materials, with delivery scheduled against measured consumption rather than against whatever is left in the store.
Wear parts, reagents and consumables
A concentrator does not fail because a part is unavailable in the world. It fails because the part is unavailable at the site on the day the mill is down, and the difference between those two statements is planning.
That is why we ask for consumption data rather than order quantities. Tonnes milled per month, liner life in hours, reagent dosage in grams per tonne — from those numbers a delivery schedule can be built that does not depend on anyone noticing the store is empty.
- Crushing — mantles, concaves, jaw plates, blow bars, cheek plates
- Grinding — mill liners, grinding media, trommel screens
- Flotation reagents — frothers, collectors, depressants, activators, modifiers
- Material handling — conveyor belting, idlers, pulleys, skirting, slurry pumps and spares
- Screening — polyurethane and rubber panels, wire mesh
- Blasting materials — industrial ammonium nitrate and associated documentation
Reagents: buy the chemistry, not the label
Reagent enquiries almost always arrive as a brand name. It is the fastest way to describe a product that works, and the worst way to buy it, because a brand narrows the market to one seller and hides which properties the plant actually depends on.
What a usable reagent specification contains
Binding parameters, each with a test method — the values a supplier must meet. Typical values, clearly marked as informative — figures quoted for guidance that are not grounds for rejection. Without that separation, a good offer gets rejected for missing a number nobody cared about, or a poor one gets accepted because the wrong number looked right.
We write that document, put it out to qualified manufacturers, and let the plant compare like with like. In practice this usually widens the supplier base from one to three or four, with no change in metallurgical performance and a meaningful change in lead time and price.
For blasting materials and other regulated products, documentation and transport approvals are part of the supply rather than an afterthought — including rail movements to landlocked sites, where discharge windows at the border carry demurrage exposure that has to be planned for before the rake leaves.
Product groups
Related projects
Mining
Industrial Ammonium Nitrate — 2,000 MT Rail Supply to a Copper Mining Group
A 2,000 MT industrial ammonium nitrate delivery moved by rail across a land border, planned around wagon demurrage terms rather than port…
Mining
Flotation Frother Supply — Specification-Led Substitution at a Copper Concentrator
A concentrator asked for a single frother brand. We supplied against a chemistry-based minimum specification instead, which opened the market without changing…
Send us your consumption figures
Tonnes milled, liner life, reagent dosage. From those we can build a delivery schedule instead of reacting to an empty store.
